Categories
Design/Build Hospitality

SouthPark Square Apartments Gets a New Pool

Occasionally Western Construction bids and wins business that lends itself well to visual documentation; The SouthPark Square Apartments rooftop pool project was one such example.

Holland Partner Group, who manages the building in downtown Portland, reached out to Western Construction to take over the project. We were tasked with removing the old roofing, furniture, and remaining materials to prepare the roof for a fabulous new pool area designed by Garrison Hullinger and Dominek Architecture. The goal was to create a new pool, roofing, decking, and an outdoor living area the residents of SouthPark Square can enjoy for years to come

In the following videos you can see the state of the project and follow along. From our tear down of the deteriorating tent, dilapidated roofing, and other debris from the previously abandoned job, all the way through to a beautiful new pool, hot-tub, and outdoor area for the residents – in only 16 weeks.

OK, we have exactly 16 weeks to transform the roof into a fabulous and livable space for hundreds of residents… here we go!

Check out our week 1 video to get a quick idea of the what exactly we were up against to start this project. A previous job had left the roofing half complete, a deteriorating scaffolding, and debris all over the place. The rooftop needed some TLC before we could help our client construct the pool deck of their (and their tenants) dreams.

As the remaining roofing was removed, we also took down the deteriorated tent to enable our crew to better access the roof and continue the renovation. Thanks to the expertise of Maxim Crane Works, we were able to safely and efficiently get necessary materials and equipment to the rooftop despite the job taking place right next to a bustling Saturday market in Downtown Portland.

During the third week, most all the remaining material from the previously abandoned job had been successfully removed and we began the process of readying the foundation for the pool. In the opening drone shot, you can see the lines and grid for what will become the pool. During our second of many crane lifts, we got the lumber for cement forms to the roof, and all the garbage down. We also delivered Crumbl Cookies to the residents who were affected by the construction – they loved them.

Thankfully, the weather had cooperated with us and all crews had been working exactly on schedule to complete this amazing rooftop project. In weeks 4 and 5 we did a concrete pump up to the 9th floor to fill the pool foundation forms. Synchronized work of the various crews from Brand Safway, Fine Line Concrete, and Maxim Crane made this concrete pump amazingly efficient and satisfying to watch.

The expert drone work in the week 6 video below is something to watch!  Our marketing team of Jim Beriault (RocketGlow Marketing) and video work of Dan Pred (Video Media Portland) and Bobby Pollatta (Bobby P Media) really shine here.  During this week, the crane required an extension in order to bring up the decking materials. Follow along up close through the whole process!

During weeks 7 and 8, the crews continued finalizing the roofing material and began waterproofing the drains and fixtures to prepare for the fall rains. Additionally, the existing rooftop bathroom had to be gutted and completely refinished with a new entry, door, and fixtures. Every other Saturday, we lifted new material to the 9th floor rooftop. This week those lifts included grey slate tiles and the foam foundations for them. As you will see it takes tremendous coordination and timing for all crews involved to successfully install the foundation later in the week. Finally, our good friends at Crumbl dropped off more cookies for the residents who were excitedly awaiting their new pool.

In week 9 we began work on the deck structure. Our subcontractors laid out the design and began to construct the deck material we had lifted earlier. At the same time, the Foam support foundation was nearing completion. Once completed it would allow for the slate tiles to be placed, and give added weather insulation to the residents.

During week 10, we began laying the grey slate tiles. It was an exacting process for our subcontractor Tueful Landscaping. A metal backing was applied to each tile, and they were carefully laid out. Each tile was painstakingly lined up for a perfect fit and placement. While tedious, lining up the tiles is important to prevent mold, water damage, or other unwanted issues for our client going forward. In our next video, you will see that the entirety of the tile was laid with the utmost care and attention to detail, to ensure our client’s building was ready to handle even the nastiest weather the PNW could throw at it.

As you can see the tile work was nearing completion in week 11, as our subs took care of cutting and installing tiles for corners and ends. We also began installation of the metal frame for the pool – of which all pieces were expertly crafted by InstaFAB right here in Portland. These giant steel structures had to be lifted through the buildings in Downtown Portland, another process made easy thanks to the expertise of Maxim Crane Works.

In weeks 12, 13, and 14 pool parts from Italy finally arrived. After being held up in Seattle due to supply chain issues, we were excited to get construction of the pool underway. There were hundreds of parts to be accounted for and readied so our sub Anderson Poolworks could begin construction of a marvelous pool for the tenants of SouthPark Square Apartments.

Here are updates from throughout October and November. With the pool pans in place, the pool was finally ready for cement and subsequently tiling both inside and outside. We also got the barbeque area prepped and installed the barbeque itself. With the pool cemented, the barbeque installed, and tiles beginning to be placed, you can really start to see our clients dream taking shape!

See Completed Photos Below!

Creating a rooftop pool in Downtown Portland is no simple task, but our dedicated team of over 50 employees is highly experienced, adept at problem solving, and can handle anything a job may throw at them. Best of all, our staff is excitedly awaiting our chance to bring your vision and your dreams to life and to show you why we have a reputation as one of the West’s most dependable and trusted construction companies.

Categories
Design/Build

The advantages of a Design/Build team for your next project: Western Construction Blog

When a client comes to Western Construction Services our goal is to make the project is as seamless as possible. All the aspects of construction – concept, design, permits, materials, construction come together with minimal friction and surprises. It’s not an easy goal to achieve and it takes extensive experience, a remarkable team, and the ability to anticipate issues before they arrive. And believe us, every project has challenges.

 

Western Construction’s Design/Build team makes all the difference in our success, and ultimately yours as well. When our team oversees your project, along with your project manager, you just gave your vision and construction dream the team it deserves. In this blog we give you three videos we’d like you to watch. Each one serves up a different perspective on our design/build service. First let’s start with Kevin Kinkaid and learn more about the inner workings of the team, and the difference it will make for your next project.

As Kevin mentioned in the video, Western Construction is adept at working with architects and designers. If you already have plans, or are already working with an architect, we invite you and your architect to the table, and help keep the project moving along. Phil Sydnor with Integrate Architecture has had tremendous success over the years with Western Construction and he tells you why. The review of plans to find potential permitting issues, or compliance problems needs to happen early on in the process, it’s a time and cost saver for his clients.  Let’s learn more here.

 

 

 

“They [Western] have a faith in the client and the projects which really stands out and they’re prepared to give it any attention it needs preconstruction

– Phil Sydnor, Owner, Integrate Architecture

Lastly, we also work directly with designers as well. Interior designers and planners are integral in the look, feel, and experience of an intended project, and we assist in making their vision come to life. Clients and designers have been coming to Western Construction for 40 years and together, we’ve done outstanding work. Let’s hear from long-time Portland designer Nancy Richmond about why she trusts Western Construction.

Are you ready to turn your dream into reality? Be sure to contact one of our project managers and let’s start building together!

 

Be sure to visit our Design & Build page too – click HERE

Categories
Design/Build Uncategorized

Tenant Improvement: Western Construction Services BLOG

Western Construction Services is highly skilled on both sides of the tenant improvement equation. If you are a retailer seeking to build-out a space you’ve leased, or a mall/retail leasing manager with a client at-the-ready to build, we are ready to assist you in your journey toward opening your doors to the public.

Many people share a dream of opening their own business or storefront. Whether inside a mall, along a street, or a stand-alone building, the process of a buildout can be complicated. This is where a guide – a contractor – is necessary to transform that dream into reality.

Over the past 40 years, Western Construction has worked with numerous retailers, local and regional malls, street side buildouts, and even ground-up projects for major companies. Each involves different levels of design, permitting, planning, build-out, and special access.

We’d like to share several such stories. First let us introduce Peter and Le Sterr. This husband and wife team decided to launch a brand-new concept called Ding Tea in North Portland. This was their very first journey into retail, and luckily they had been referred to Western Construction Services and Project Manager David Szyplinski. Peter and Le describe their journey here:

Western Construction Services president, Ken Andrews has had an ongoing relationship with CenterCal – one of the largest mall leasing and management companies in the west. Western has been privileged to provide tenant improvements for their leased spaces, maintenance, and holiday décor needs. Meet Karl Hunter with CenterCal, and learn about how Western Construction Services gets it done for Bridgeport Village:

 



We need a contractor, such as Western Construction Services, who has that integrity to be able to turn that [the job] over to that contractor and know that when the tenant gets it, it’s going to be the quality that we not only we promise to them, but that we expect ourselves

-Karl Hunter, Project Manager, CenterCal

Furthermore, Western has been on the forefront of restaurant build-outs and ground up construction. Many tenant improvement projects are delis, coffee shops, or convenience based. One example is our 20-year relationship with Portland’s iconic Elephants Delicatessen. Anne Weaver, CEO of Elephants Delicatessen depends on Western Construction, and it’s always her first call.


“They’re trustworthy, reliable, and they can meet all your construction needs

– Anne Weaver, CEO, Elephants Delicatessen

 

 

 

We know tenant improvement. Be sure to visit our tenant improvement page HERE, see our photos, watch our video and learn more about our services.